Browse articles
TECHNICAL SERIES
PCS 7 Networks.
From bus roles and physical network design to host connectivity, switch configuration and failure testing.
Planned parts show the intended reading sequence. They will be linked here when available.
- Available · 14 min read
Bus Roles and Plant Bus Design
Define the bus roles, compare single and dual Plant Bus designs, and count every switch connection.
Read Part 01 - Planned
Terminal Bus Design
Connect OS Servers, OS Clients and the Engineering Station, with clear network boundaries.
- Planned
OS Server Redundancy
Separate application redundancy from network redundancy and define the OS Server redundancy connection.
- Planned
Engineering Station Connectivity
Map engineering access to the Plant Bus and Terminal Bus.
- Planned
PCS 7 Networks on ESXi
Trace VM connections through virtual switches, physical NICs and switch ports.
- Planned
VLANs, IP Addressing and Switch Configuration
Turn the architecture into addressing, VLAN and switch configuration decisions.
- Planned
Failure Testing and Acceptance
Define the failure scenarios, observations and evidence needed for acceptance.